*Note: The following information is provided without warranty of any kind and for informational purposes only.
Copyright © Pacific Security Capital – All Rights Reserved

A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z

 

Top

U

Under Construction: When construction has started but the Certificate of Occupancy has not yet been issued.

Under Contract: A property for which the seller has accepted the buyer’s offer to purchase is referred to as being “under contract”. Generally, the prospective buyer is given a certain period of time in which to perform its due diligence and finalize financing arrangements. During the period of time the property is under contract, the seller is precluded from entertaining offers from other buyers.

Unencumbered: Describes title to property that is free of liens and any other encumbrances. Free and clear. See also "Encumbrances.”

Unimproved Land: Most commonly refers to land without improvements or buildings but can also mean land in its natural state. See also, Raw Land”.

Use: The specific purpose for which a parcel of land or a building is intended to be used or for which it has been designed or arranged.

Usable Square Footage: Usable Square Footage is the area contained within the demising walls of the tenant space. Total Usable Square Footage equals the Net Square Footage x the Circulation Factor. Also see: Circulation Factor and Net Square Footage.

 

 

Top

V

Vacancy Factor: The amount of gross revenue that pro forma income statements anticipate will be lost because of vacancies, often expressed as a percentage of the total rentable square footage available in a building or project.

Vacancy Rate: The total amount of available space compared to the total inventory of space and expressed as a percentage. This is calculated by multiplying the vacant space times 100 and then dividing it by the total inventory.

Vacant Space: Refers to existing tenant space currently being marketed for lease. This excludes space available for sublease.

Variance: Refers to permission that allows a property owner to depart from the literal requirements of a zoning ordinance that, because of special circumstances, cause a unique hardship. Included would be such things as the particular physical surroundings, shape or topographical condition of the property and when compliance would result in a practical difficulty and would deprive the owner of the reasonable use of the property.

 


Top of the Page

Privacy Policy | Copyright/Legal

2003© Pacific Security Capital. All Rights Reserved